Pièce A-6696 - Geology Building - Construction

Original Objet numérique not accessible

Zone du titre et de la mention de responsabilité

Titre propre

Geology Building - Construction

Dénomination générale des documents

Titre parallèle

Compléments du titre

Mentions de responsabilité du titre

Notes du titre

Niveau de description

Pièce

Cote

A-6696

Zone de l'édition

Mention d'édition

Mentions de responsabilité relatives à l'édition

Zone des précisions relatives à la catégorie de documents

Mention d'échelle (cartographique)

Mention de projection (cartographique)

Mention des coordonnées (cartographiques)

Mention d'échelle (architecturale)

Juridiction responsable et dénomination (philatélique)

Zone des dates de production

Date(s)

  • 1985 (Production)

Zone de description matérielle

Description matérielle

1 photograph : b&w

Zone de la collection

Titre propre de la collection

Titres parallèles de la collection

Compléments du titre de la collection

Mention de responsabilité relative à la collection

Numérotation à l'intérieur de la collection

Note sur la collection

Zone de la description archivistique

Historique de la conservation

Portée et contenu

Foundation being laid for the Geology Building. Excavation equipment in foreground, with crane in background. Buildings in background from l to r: Arts Tower, Chemistry (Thorvaldson) Building and Physics Building at far right.

Bio/Historical Note: The construction of the Geology Building marked a return to the early style of campus architecture. The Department of Geology had been formed in 1927 and for the next six decades was based in the east wing of the Engineering Building. A growing faculty and student population had forced the department to cobble together makeshift accommodation in trailers and remote campus buildings. Designed by the architectural firm Black, McMillan and Larson of Regina, the building was given a neo-Collegiate Gothic exterior to blend harmoniously with the other buildings in the central campus. The two-and-a-half-storey building was erected just south or the Bowl side of the W.P. Thompson Biology Building, providing 8,543 square metres for office, laboratory, library, classroom, and storage space for rock and fossil samples. The exterior was clad with greystone and dressed with tyndal limestone. The dominant feature of the interior was a two-story atrium that featured the mosaics for the former exterior walls of the Thompson Building, a life-size skeleton of a Tyrannosaurus rex and geological and biological displays. The $18.5 million Geology Building was completed in 1988 and fused the space between Physics and Biology and linked, through a walkway, with Chemistry, creating an integrated science complex on campus.

Zone des notes

État de conservation

Source immédiate d'acquisition

Classement

Langue des documents

Écriture des documents

Localisation des originaux

Disponibilité d'autres formats

Restrictions d'accès

There are no restrictions on access

Délais d'utilisation, de reproduction et de publication

Photographer: Zuik

Copyright: University of Saskatchewan

Instruments de recherche

Éléments associés

Éléments associés

Accruals

Identifiant(s) alternatif(s)

Zone du numéro normalisé

Numéro normalisé

Mots-clés

Mots-clés - Sujets

Mots-clés - Lieux

Mots-clés - Genre

Zone du contrôle

Objet numérique (Fichier maître) zone des droits

Objet numérique (Référence) zone des droits

Objet numérique (Vignette) zone des droits

Accession area