Stuk A-9080 - Engineering Building - Addition - Construction

Title and statement of responsibility area

Titel

Engineering Building - Addition - Construction

Algemene aanduiding van het materiaal

  • Graphic material

Parallelle titel

Overige titelinformatie

Title statements of responsibility

Titel aantekeningen

Beschrijvingsniveau

Stuk

referentie code

A-9080

Editie

Editie

Edition statement of responsibility

Class of material specific details area

Statement of scale (cartographic)

Statement of projection (cartographic)

Statement of coordinates (cartographic)

Statement of scale (architectural)

Issuing jurisdiction and denomination (philatelic)

Datering archiefvorming

Datum(s)

  • Oct. 1978 (Vervaardig)

Fysieke beschrijving

Fysieke beschrijving

1 negative : b&w ; 5.5 x 5.5 cm

Publisher's series area

Title proper of publisher's series

Parallel titles of publisher's series

Other title information of publisher's series

Statement of responsibility relating to publisher's series

Numbering within publisher's series

Note on publisher's series

Archivistische beschrijving

Geschiedenis beheer

Bereik en inhoud

View of early stages of construction of the Engineering Building addition.

Bio/Historical Note: In the late 1970s the Engineering Building would go through drastic renovations. In six stages from 1977 to 1983 the entire building was completely overhauled and redesigned. It encompassed the replacement of the original portion of the single storey west wing, the removal of the Storage Building, the construction of additions, and renovations in what remained of the original building. The architectural firm responsible for this redesign was Forrester, Scott and Bowers, and the total cost of the project would eventually surpass $13 million. The reconstruction began in 1977. It included the demolition of the old central heating and power plant, the construction of additions to house the Hardy Lab and central shops, and the relocation of a small section serving the Department of Geological Sciences. The second phase included the demolition of a one-storey wing of the building which adjoined the Hardy Lab, and its replacement with a larger three-story structure. A second storey was then built over the office section of the Hardy Lab, which was also renovated. The first phase of demolition work was carried out by CEL Contracting for $136,000 while the second was performed by Roscoe Enterprises for $39,626. The majority of the reconstruction itself was performed by Cana Construction for $1,012,730.

Aantekeningen

Materiële staat

Directe bron van verwerving

Ordening

Taal van het materiaal

Schrift van het materiaal

Plaats van originelen

Beschikbaarheid in andere opslagformaten

Restrictions on access

There are no restrictions on access.

Termen voor gebruik, reproductie en publicatie.

Photographer: Unknown

Copyright holder: Unknown

Copyright expires: Unknown

Other terms: The researcher is responsible for obtaining copyright permission.

Toegangen

Associated materials

Related materials

Aanvullingen

Location note

Neg. Vol. 12

Alternative identifier(s)

Standard number area

Standaard nummer

Trefwoorden

Onderwerp trefwoord

Geografische trefwoorden

Genre access points

Beheer

Voorwaarden voor raadpleging en gebruik

Related subjects

Related people and organizations

Related places

Related genres