Zone du titre et de la mention de responsabilité
Titre propre
Engineering Building - Addition - Construction
Dénomination générale des documents
- Document graphique
Titre parallèle
Compléments du titre
Mentions de responsabilité du titre
Notes du titre
Niveau de description
Pièce
Cote
Zone de l'édition
Mention d'édition
Mentions de responsabilité relatives à l'édition
Zone des précisions relatives à la catégorie de documents
Mention d'échelle (cartographique)
Mention de projection (cartographique)
Mention des coordonnées (cartographiques)
Mention d'échelle (architecturale)
Juridiction responsable et dénomination (philatélique)
Zone des dates de production
Date(s)
-
Oct. 1978 (Production)
Zone de description matérielle
Description matérielle
1 negative : b&w ; 5.5 x 5.5 cm
Zone de la collection
Titre propre de la collection
Titres parallèles de la collection
Compléments du titre de la collection
Mention de responsabilité relative à la collection
Numérotation à l'intérieur de la collection
Note sur la collection
Zone de la description archivistique
Nom du producteur
Historique de la conservation
Portée et contenu
View of early stages of construction of the Engineering Building addition.
Bio/Historical Note: In the late 1970s the Engineering Building would go through drastic renovations. In six stages from 1977 to 1983 the entire building was completely overhauled and redesigned. It encompassed the replacement of the original portion of the single storey west wing, the removal of the Storage Building, the construction of additions, and renovations in what remained of the original building. The architectural firm responsible for this redesign was Forrester, Scott and Bowers, and the total cost of the project would eventually surpass $13 million. The reconstruction began in 1977. It included the demolition of the old central heating and power plant, the construction of additions to house the Hardy Lab and central shops, and the relocation of a small section serving the Department of Geological Sciences. The second phase included the demolition of a one-storey wing of the building which adjoined the Hardy Lab, and its replacement with a larger three-story structure. A second storey was then built over the office section of the Hardy Lab, which was also renovated. The first phase of demolition work was carried out by CEL Contracting for $136,000 while the second was performed by Roscoe Enterprises for $39,626. The majority of the reconstruction itself was performed by Cana Construction for $1,012,730.
Zone des notes
État de conservation
Source immédiate d'acquisition
Classement
Langue des documents
Écriture des documents
Localisation des originaux
Disponibilité d'autres formats
Restrictions d'accès
There are no restrictions on access.
Délais d'utilisation, de reproduction et de publication
Photographer: Unknown
Copyright holder: Unknown
Copyright expires: Unknown
Other terms: The researcher is responsible for obtaining copyright permission.
Instruments de recherche
Éléments associés
Accruals
Location note
Neg. Vol. 12