Stuk A-8900 - Engineering Building - Construction

Title and statement of responsibility area

Titel

Engineering Building - Construction

Algemene aanduiding van het materiaal

  • Graphic material

Parallelle titel

Overige titelinformatie

Title statements of responsibility

Titel aantekeningen

Beschrijvingsniveau

Stuk

referentie code

A-8900

Editie

Editie

Edition statement of responsibility

Class of material specific details area

Statement of scale (cartographic)

Statement of projection (cartographic)

Statement of coordinates (cartographic)

Statement of scale (architectural)

Issuing jurisdiction and denomination (philatelic)

Datering archiefvorming

Datum(s)

  • Nov. 1911 (Vervaardig)

Fysieke beschrijving

Fysieke beschrijving

1 postcard : b&w ; 20 x 25 cm
1 negative

Publisher's series area

Title proper of publisher's series

Parallel titles of publisher's series

Other title information of publisher's series

Statement of responsibility relating to publisher's series

Numbering within publisher's series

Note on publisher's series

Archivistische beschrijving

Geschiedenis beheer

Bereik en inhoud

View of first Engineering Building shortly after completion.

Bio/Historical Note: The original Engineering Building was designed to house the Agricultural Engineering Department, though it would eventually be home to the Department of Field Husbandry as well. The redbrick exterior was largely constructed during the summer of 1911 while the interior work was completed during the winter of 1911-12. The Engineering Building was designed by the original campus architects, David Brown and Hugh Vallance, and made allowances for the great variety of work within the field of agricultural engineering: the lower floor was designed for use in blacksmithing, cement work, engine construction and heavy farm machinery. The second floor contained a lecture room as well as room for woodwork, carpentry, pumps and farm-barn equipment. The third floor was devoted to a draughting room and light farm equipment. The main entrance to the building opened into the blacksmith’s forge. In 1913 a second wing was built with Brown and Vallance again serving as chief architects, as they would again in 1920. By December 1923 a final addition, designed by Saskatoon architect J. K. Verbeke, was completed by Bennett & White Construction for $8,800. At approximately 3 a.m. on the morning of Friday, 13 March 1925, a fire broke out in the north end of the building's Tractor Laboratory. In less than three hours everything but the Ceramic Lab had been completely destroyed. The fire came as a shock to many, as the entire building had been subjected to a rigorous fire inspection only a day prior to the blaze. Plans for a new Engineering Building to be constructed on the original foundation were promptly issued, and other building projects, including the long-anticipated Arts Building, were postponed.

Aantekeningen

Materiële staat

Directe bron van verwerving

Ordening

Taal van het materiaal

Schrift van het materiaal

Plaats van originelen

Beschikbaarheid in andere opslagformaten

Restrictions on access

Termen voor gebruik, reproductie en publicatie.

Photographer: Unknown

Other terms: Researcher responsible for obtaining copyright permission

Toegangen

Associated materials

Related materials

Aanvullingen

Alternative identifier(s)

Standard number area

Standaard nummer

Trefwoorden

Onderwerp trefwoord

Geografische trefwoorden

Naam ontsluitingsterm

Genre access points

Beheer

Voorwaarden voor raadpleging en gebruik

Related subjects

Related people and organizations

Related places

Related genres