- GR2.003
- Item
- [ca 1950]
Extreme left is Mayor A. Handelman, then Bill Mullen, Clerk. Engineer and workers beside dragline.
7 results directly related Exclude narrower terms
Extreme left is Mayor A. Handelman, then Bill Mullen, Clerk. Engineer and workers beside dragline.
City of Moose Jaw, Sewage System
Part of MJ General Photograph Collection
Photograph of the newly dug sewage lagoon for the City of Moose Jaw, Saskatchewan. On bottom border of photograph reads: “Contractor: Patrick Construction, Saskatoon, Sask”, “City of Moose Jaw Sewage System” and “Haddin, Davis & Brown, Consulting Engineers, Regina, Sask”
Excelo Photo Co. Ltd.
Men constructing the sewer system
Part of City of Regina fonds
Men constructing the sewer system
Men constructing the sewer system
Part of City of Regina fonds
Men constructing the sewer system
Five women and a young boy hold picket signs demanding the installation of water and sewer on Little Flower Avenue, Sixth and Seventh Avenues West be completed, after a prolonged wait through wintertime. After a rumour spread that construction was about to cease, women protestors painted pickets. L-R: Geraldine Smith, Marguerite (Mary) Lavigne, Irene Driedger, ?, Richard Arsenault, Ruby Arsenault.
Crew of nine men and two horses pose for the camera. Part of South Saskatchewan riverbank has been excavated with wood framed structure under construction. CPR bridge in background. Stamped signature of A.R. Greig on back of photograph. "Septic tank on river bank" written on back.
Sewer and water installation in Rosetown
L-R: John Graham, Dr. Abe Handelman, Engineer. Standing in front of dragline digging a trench for a sewer line.