Opening Ceremonies√

Taxonomy

Code

Scope note(s)

Source note(s)

Display note(s)

Hierarchical terms

Opening Ceremonies√

Equivalent terms

Opening Ceremonies√

Associated terms

3 Archival description results for Opening Ceremonies√

3 results directly related Exclude narrower terms

Place Riel Student Centre - Official Opening

Hugh Arscott, chairman of the Place Riel Society, gives a brief history of the Centre during the official opening of the Place Riel Campus Centre Individuals identified on the platform (from l to r ): George Prosk, executive director of the Centre; Doug McArthur, Saskatchewan Minister of Continuing Education; Cliff Wright, Mayor of Saskatoon; Dr. William Sibley, chairman, Universities Commission; Christine Pastershank, chairman, Board of Governors; Gordon Blackmore, president of the Students' Union; Leo Kristjanson, University President and representatives of the architects and contractors.

Bio/Historical Note: While construction on the Place Riel Student Centre complex was not begun until well into the 1970s, planning for the structure actually began a decade earlier. During the 1964-1965 academic year the Students’ Union recognized the need for facilities much more extensive than could be offered in the MUB. While the MUB had only been completed in 1955 an expanding student population had already made it obsolete as a central location for student activities and leisure on campus. A Commission was established to investigate the matter and in 1964 student questionnaires and several studies were carried out. In a referendum in February 1966, 69.4% of students voted to increase a mandatory building tuition fee to $12. In 1967 the University and the Students’ Union jointly established a Project Building Committee to plan the required facilities. The University recognized its financial commitment to the project in late 1967 and included its anticipated share in the capital program request for 1968/69 and subsequent years. During the 1973-1974 academic year the student body voted in favour of another increase in the annual building fee to $20. The Place Riel Student Centre was constructed in three phases from 1976 to 1980 for a combined cost of $5,794,315. The original concept for the project had been the construction of a large freestanding building which incorporated all of the needs of the Student Centre. This plan was eventually adapted to include the use of space in the Arts Building and the Memorial Union Building (MUB) for student facilities primarily to offset construction costs. The first phase of the project involved the renovation of the Theatre Wing of the Arts Building. This was completed in 1976 for $178,080 by Smith Bros. and Wilson. It was designed by D. H. Stock and Partners. The second phase of construction involved the building of Place Riel itself. Place Riel was completed in 1979 for $3,916,235. It was designed by the architectural firm of Ferguson Folstad Friggstad and was built by Ellis Don Construction. The final phase of construction involved the renovation of the MUB, which was again designed by Ferguson Folstad Friggstad. The renovations were completed by Bennett and White Construction in 1980. They included the demolition and removal of portions of the building, structural alterations, interior renovations, improvements to the elevator, and alterations and renovations to the Tunnel. Originally estimated at $902,688, this final phase of the project would eventually cost $1.7 million. The completed building provided space for the Students’ Union Business Office, Sheaf Offices, commercial space for kiosks, meeting and seminar rooms, several general lounge areas, a theatre in the Arts Building, a discotheque (Louis’ Pub) in the MUB, a music listening room, a television lounge, a grad student lounge and a billiard and arcade room. Space in the building was also leased to campus radio station CJUS-FM, the Alumni Office, Student Counselling Services, a Canada Manpower Centre, the campus bookstore and food and vending services. The Centre officially opened in September 1980. Until 1998, when the students’ union assumed complete control, Place Riel was managed by the Place Riel Society, a board with representation from the university, students, and alumni. The use of the building has evolved over the years, particularly following numerous renovations over the years, with lower Place Riel now being dominated by a food court.

Thorvaldson Building - Official Opening

[Ross Thatcher, Premier of Saskatchewan] sits at far right with dignitaries seated in foreground. Crowd stands behind dignitaries in background.

Bio/Historical Note: The Chemistry Building was enlarged with an addition and was renamed in honour of Dr. Thorbergur Thorvaldson, professor and dean of Chemistry from 1919-1959. The Thorvaldson Building opened on 6 June 1966. Architect John B. Parkin’s modern design continued with exterior stone cladding. The near windowless, stone three-storey addition provided classrooms, undergraduate and research laboratories, offices, a library and service facilities.

Veterinary Infectious Disease Organization - Official Opening

R.W. Begg, University President, speaks from podium during the opening of the Vaccine and Infectious Disease Organization (VIDO). Dignitaries seated are (l to r): M. Moore; Herman Rolfes, Saskatchewan Minister of Continuing Education; and Dr. Chris Bigland, director of VIDO.

Bio/Historical Note: The Vaccine and Infectious Disease Organization (VIDO) is a research organization of the University of Saskatchewan that operates with financial support from the Government of Canada, the government of Saskatchewan, livestock industry councils and agencies, foundations and human and animal health companies. VIDO worked to find cures for common infectious diseases in cattle, swine and poultry. VIDO scientists carved out an international reputation for their pioneering work in the 1980's on vaccines aimed at combating shipping fever and a disease which produces pneumonia and arthritis in cattle. In addition to the 2,500,000 sq ft facility on campus, VIDO-InterVac also operates a 160-acre research station. The laboratory took on its current name, International Vaccine Centre (VIDO-InterVac), in March 2003. In October 2003 a large expansion was completed. In March 2004, VIDO received funding for the construction one of the world's largest and most advanced biosafety level 3 facilities, the International Vaccine Centre (InterVac), for research into emerging and reemerging human and animal diseases. In 2020, VIDO-InterVac began developing a vaccine for SARS-CoV-2 during the COVID-19 pandemic.