Item A-9186 - Geology Building - Construction

Original Digital object not accessible

Title and statement of responsibility area

Title proper

Geology Building - Construction

General material designation

  • Graphic material

Parallel title

Other title information

Title statements of responsibility

Title notes

Level of description

Item

Reference code

A-9186

Edition area

Edition statement

Edition statement of responsibility

Class of material specific details area

Statement of scale (cartographic)

Statement of projection (cartographic)

Statement of coordinates (cartographic)

Statement of scale (architectural)

Issuing jurisdiction and denomination (philatelic)

Dates of creation area

Date(s)

  • 1 Mar. 1985 (Creation)

Physical description area

Physical description

1 photograph : b&w ; 11 x 16.5 cm

Publisher's series area

Title proper of publisher's series

Parallel titles of publisher's series

Other title information of publisher's series

Statement of responsibility relating to publisher's series

Numbering within publisher's series

Note on publisher's series

Archival description area

Custodial history

Scope and content

Progress shot of construction of the Geology Building. Students walking in foreground; Physics Building at far right. Winter scene.

Bio/Historical Note: The construction of the Geology Building marked a return to the early style of campus architecture. The Department of Geology had been formed in 1927 and for the next six decades was based in the east wing of the Engineering Building. A growing faculty and student population had forced the department to cobble together makeshift accommodation in trailers and remote campus buildings. Designed by the architectural firm Black, McMillan and Larson of Regina, the building was given a neo-Collegiate Gothic exterior to blend harmoniously with the other buildings in the central campus. The two-and-a-half-storey building was erected just south or the Bowl side of the W.P. Thompson Biology Building, providing 8,543 square metres for office, laboratory, library, classroom, and storage space for rock and fossil samples. The exterior was clad with greystone and dressed with tyndal limestone. The dominant feature of the interior was a two-story atrium that featured the mosaics for the former exterior walls of the Thompson Building, a life-size skeleton of a Tyrannosaurus rex and geological and biological displays. The $18.5 million Geology Building was completed in 1988 and fused the space between Physics and Biology and linked, through a walkway, with Chemistry, creating an integrated science complex on campus.

Notes area

Physical condition

Immediate source of acquisition

Arrangement

Language of material

Script of material

Location of originals

Availability of other formats

Restrictions on access

There are no restrictions on access.

Terms governing use, reproduction, and publication

Photographer: Unknown

Copyright holder: Unknown

Copyright expires: Unknown

Other terms: The researcher is responsible for obtaining copyright permission.

Finding aids

Associated materials

Related materials

Accruals

Location note

Vol. 69

Alternative identifier(s)

Standard number area

Standard number

Access points

Subject access points

Place access points

Genre access points

Control area

Digital object (Master) rights area

Digital object (Reference) rights area

Digital object (Thumbnail) rights area

Accession area

Related subjects

Related people and organizations

Related places

Related genres