Item A-8895 - Dental Clinic - Construction

Original Digital object not accessible

Title and statement of responsibility area

Title proper

Dental Clinic - Construction

General material designation

  • Graphic material

Parallel title

Other title information

Title statements of responsibility

Title notes

Level of description

Item

Reference code

A-8895

Edition area

Edition statement

Edition statement of responsibility

Class of material specific details area

Statement of scale (cartographic)

Statement of projection (cartographic)

Statement of coordinates (cartographic)

Statement of scale (architectural)

Issuing jurisdiction and denomination (philatelic)

Dates of creation area

Date(s)

  • 14 June 1976 (Creation)

Physical description area

Physical description

1 negative : b&w ; 5.5 x 5.5 cm

Publisher's series area

Title proper of publisher's series

Parallel titles of publisher's series

Other title information of publisher's series

Statement of responsibility relating to publisher's series

Numbering within publisher's series

Note on publisher's series

Archival description area

Custodial history

Scope and content

Progress shot of construction of the Dental Clinic.

Bio/Historical Note: Although classes began in 1968, construction for a building did not begin until 1978. This lack of appropriate accommodation in part meant that of 90 applicants for the College of Dentistry’s first class, only 10 students could be accepted. Research space was provided through the Cancer Institute; offices and a seminar room, through Ellis Hall; and space for Dentistry was planned for the proposed additions to the Medical College Building and University Hospital. A general economic slowdown in the provincial economy delayed construction of a building, and subsequently decreased the number of students accepted into the program. By 1973 the college was located within the Health Sciences Building, and were hoping for “construction of permanent clinic facilities adjacent to the Health Sciences Building, with a firm target date of 1977.” The Dental Clinic Building, designed by Holliday-Scott, Paine, was completed at a cost of $4 million; students and faculty moved in in January 1979. The maximum number of students for the College – 25 – were admitted for the first time for the 1979-80 winter term. Enveloped by the new Health Sciences E-Wing since 2013, the Dental Clinic retains its original design sensibilities.

Notes area

Physical condition

Immediate source of acquisition

Arrangement

Language of material

Script of material

Location of originals

Availability of other formats

Restrictions on access

There are no restrictions on access.

Terms governing use, reproduction, and publication

Photographer: Unknown

Copyright holder: Unknown

Copyright expires: Unknown

Other terms: The researcher is responsible for obtaining copyright permission.

Finding aids

Associated materials

Related materials

Accruals

Location note

Neg. Vol. 12

Alternative identifier(s)

Standard number area

Standard number

Access points

Subject access points

Place access points

Name access points

Genre access points

Control area

Digital object (Master) rights area

Digital object (Reference) rights area

Digital object (Thumbnail) rights area

Accession area

Related subjects

Related people and organizations

Related places

Related genres