Item A-348 - Engineering Building - Construction

Original Digital object not accessible

Área de título y declaración de responsabilidad

Título apropiado

Engineering Building - Construction

Tipo general de material

  • Graphic material

Título paralelo

Otra información de título

Título declaración de responsabilidad

Título notas

Nivel de descripción

Item

Código de referencia

A-348

Área de edición

Declaración de edición

Declaración de responsabilidad de edición

Área de detalles específicos de la clase de material

Mención de la escala (cartográfica)

Mención de proyección (cartográfica)

Mención de coordenadas (cartográfica)

Mención de la escala (arquitectónica)

Jurisdicción de emisión y denominación (filatélico)

Área de fechas de creación

Fecha(s)

  • 1910 (Criação)

Área de descripción física

Descripción física

2 photographs : b&w ; 20 x 25 cm

Área de series editoriales

Título apropiado de las series del editor

Títulos paralelos de serie editorial

Otra información de título de las series editoriales

Declaración de responsabilidad relativa a las series editoriales

Numeración dentro de la serie editorial

Nota en las series editoriales

Área de descripción del archivo

Historial de custodia

Alcance y contenido

Internal framing being erected for the new Engineering Building.

Bio/Historical Note: The original Engineering Building was designed to house the Agricultural Engineering Department, though it would eventually be home to the Department of Field Husbandry as well. The redbrick exterior was largely constructed during the summer of 1911 while the interior work was completed during the winter of 1911-12. The Engineering Building was designed by the original campus architects, David Brown and Hugh Vallance, and made allowances for the great variety of work within the field of agricultural engineering: the lower floor was designed for use in blacksmithing, cement work, engine construction and heavy farm machinery. The second floor contained a lecture room as well as room for woodwork, carpentry, pumps and farm-barn equipment. The third floor was devoted to a draughting room and light farm equipment. The main entrance to the building opened into the blacksmith’s forge. In 1913 a second wing was built with Brown and Vallance again serving as chief architects, as they would again in 1920. By December 1923 a final addition, designed by Saskatoon architect J. K. Verbeke, was completed by Bennett & White Construction for $8,800. At approximately 3 a.m. on the morning of Friday, 13 March 1925, a fire broke out in the north end of the building's Tractor Laboratory. In less than three hours everything but the Ceramic Lab had been completely destroyed. The fire came as a shock to many, as the entire building had been subjected to a rigorous fire inspection only a day prior to the blaze. Plans for a new Engineering Building to be constructed on the original foundation were promptly issued, and other building projects, including the long-anticipated Arts Building, were postponed.

Área de notas

Condiciones físicas

Origen del ingreso

Arreglo

Idioma del material

Escritura del material

Ubicación de los originales

Disponibilidad de otros formatos

Restricciones de acceso

Condiciones de uso, reproducción, y publicación

Photographer: Unknown

Other terms: Researcher responsible for obtaining copyright permission

Instrumentos de descripción

Materiales asociados

Materiales relacionados

Acumulaciones

Nota general

Annotated on left bottom of photograph: "20".

Identificador/es alternativo(os)

Área de número estándar

Número estándar

Puntos de acceso

Puntos de acceso por materia

Puntos de acceso por lugar

Tipo de puntos de acceso

Área de control

Digital object (Ejemplar original), área de permisos

Digital object (Referencia), área de permisos

Digital object (Miniatura), área de permisos

Área de Ingreso

Materias relacionadas

Personas y organizaciones relacionadas

Lugares relacionados

Tipos relacionados