Title and statement of responsibility area
Title proper
College of Agriculture Building - Architectural Model
General material designation
- Graphic material
Parallel title
Other title information
Title statements of responsibility
Title notes
Level of description
Item
Reference code
Edition area
Edition statement
Edition statement of responsibility
Class of material specific details area
Statement of scale (cartographic)
Statement of projection (cartographic)
Statement of coordinates (cartographic)
Statement of scale (architectural)
Issuing jurisdiction and denomination (philatelic)
Dates of creation area
Date(s)
-
1986 (Creation)
Physical description area
Physical description
1 photomechanical reproduction : col. ; 14.3 x 24.5 cm
Publisher's series area
Title proper of publisher's series
Parallel titles of publisher's series
Other title information of publisher's series
Statement of responsibility relating to publisher's series
Numbering within publisher's series
Note on publisher's series
Archival description area
Name of creator
Custodial history
Scope and content
North face of proposed Agriculture Building.
Bio/Historical Note: Original plans for the Agriculture Building had it joining Kirk Hall, the John Mitchell Building and the Crop Science Building, but the architects, Folstad-Friggstad, were instructed to provide “a highly visible complex for the College,” proposed a stand-alone building intended to state the importance of the College of Agriculture to the University. It is the first major building on campus clad with glass rather than brick or stone. The original structure cost $91 million and was constructed between 1988-1991. It consisted of five floors, with 164 research labs, 38 teaching labs, 182 offices, 9 classrooms, 4 computer training facilities, 6 conference rooms, and 167 controlled environment plant growth facilities. In addition it has an impressive inner courtyard, the Atrium, and is home to the Kenderdine Gallery, named in honour of the University’s first art instructor, Gus Kenderdine. The structure had been designed to enable future expansion, and by 2000 a sixth floor was added at a construction cost of $10 million. The new addition was intended to house Animal and Poultry Science, Food Science, and Bioinsecticide Research.
Notes area
Physical condition
Immediate source of acquisition
Arrangement
Language of material
Script of material
Location of originals
Availability of other formats
Restrictions on access
There are no restrictions on access.
Terms governing use, reproduction, and publication
Photographer: Unknown
Copyright holder: Unknown
Copyright expires: Unknown
Other terms: Responsibility regarding questions of copyright that may arise in the use of any images is assumed by the researcher.
Finding aids
Associated materials
Accruals
Location note
Vol. 83