Showing 19 results

Archival description
Signs and sign boards√
Print preview View:

11 results with digital objects Show results with digital objects

University Hospital - Opening ceremonies - T.C. Douglas

View of Premier T.C. Douglas addressing a gathering during the opening ceremonies of University Hospital.

Bio/historical note: Designed by Webster and Gilbert, architects, and built between 1948 and 1955 by Smith Bros. and Wilson, contractors, at a cost of $7,000,000.00, the 6-storey, 7-wing University Hospital was officially opened by Bentley, T.J., Saskatchewan Minister of Health on May 1955.The name was officially changed to Royal University Hospital 23 May 1990.

Farm Boys Club - Saskatoon

Club members and men pose with vehicles in front of school building. Some in backs of trucks, some sitting on running boards, some standing. K.W. Gordon and J.W. Griffith sitting on running board of second truck from left. Trees and buildings in background; sign at right.

Farm Boys Club - Saskatoon

Club members sitting in or standing on various trucks all lined up. Identified are G. Rowden, F. Smith, R. Loreny, I. [Shawn], F. Hadley. Sitting on running board of first truck are K.W. Gordon and J.W. Griffith. Power poles in background and Pavilion sign far left.

Results 1 to 15 of 19