Showing 28374 results

Archival description
Print preview View:

20964 results with digital objects Show results with digital objects

The Vice President's office in the Administration Building Addition

View of Vice President's office, reception area and staff in the addition to Administration Building.

Bio/historical note: Designed by Wiens Johnstone Architects Ltd., Regina, and built by Penn-Co Construction of Calgary during 1985-87 at a cost of $6.6 million, the three-story, fieldstone-clad addition to the Administration Building has been designated the East Wing.

The theory of drifting continents according the Wegener

The theory of drifting continents according the Wegener. One protocontinent, Gondwanaland, existing through most of geologic time (A), but later broke into "blocks: (B), and "drifted" to their present positions (C). Dotted areas on continents are areas formerly covered by shallow seas. Zumberge, 1958, p. 65.

Results 2686 to 2700 of 28374