Photo of architectural model including the third floor addition.
Bio/Historical Note: The Saskatchewan Cancer and Medical Research Institute was officially opened on 10 May 1958 by Premier T.C. Douglas. Clad in locally quarried greystone with limestone panels, it was the.last of the buildings that constituted the University’s Medical Complex’s initial phase. Designed by Izumi, Arnott and Sugiyama and completed at a cost of $783,000, the building’s purpose was to provide shared accommodation for both general medical research and cancer specific investigations. Funding came from the federal and provincial governments and the provincial and national branches of the Canadian Cancer Society. A planned third floor was added in 1966. The building was "deconstructed" in 2009, with much of the building's material recycled including the greystone cladding for use with the E Wing that opened in 2013.
Looking southwest at Cancer and Medical Research Building; winter scene.
Bio/Historical Note: The Saskatchewan Cancer and Medical Research Institute was officially opened on 10 May 1958 by Premier T.C. Douglas. Clad in locally quarried greystone with limestone panels, it was the.last of the buildings that constituted the University’s Medical Complex’s initial phase. Designed by Izumi, Arnott and Sugiyama and completed at a cost of $783,000, the building’s purpose was to provide shared accommodation for both general medical research and cancer specific investigations. Funding came from the federal and provincial governments and the provincial and national branches of the Canadian Cancer Society. A planned third floor was added in 1966. The building was "deconstructed" in 2009, with much of the building's material recycled including the greystone cladding for use with the E Wing that opened in 2013.
Looking over the pond at the rear of the building; the third floor has been completed.
Bio/Historical Note: The Saskatchewan Cancer and Medical Research Institute was officially opened on 10 May 1958 by Premier T.C. Douglas. Clad in locally quarried greystone with limestone panels, it was the.last of the buildings that constituted the University’s Medical Complex’s initial phase. Designed by Izumi, Arnott and Sugiyama and completed at a cost of $783,000, the building’s purpose was to provide shared accommodation for both general medical research and cancer specific investigations. Funding came from the federal and provincial governments and the provincial and national branches of the Canadian Cancer Society. A planned third floor was added in 1966. The building was "deconstructed" in 2009, with much of the building's material recycled including the greystone cladding for use with the E Wing that opened in 2013.
Image of the Cancer and Medical Research Building.
Bio/Historical Note: The Saskatchewan Cancer and Medical Research Institute was officially opened on 10 May 1958 by Premier T.C. Douglas. Clad in locally quarried greystone with limestone panels, it was the.last of the buildings that constituted the University’s Medical Complex’s initial phase. Designed by Izumi, Arnott and Sugiyama and completed at a cost of $783,000, the building’s purpose was to provide shared accommodation for both general medical research and cancer specific investigations. Funding came from the federal and provincial governments and the provincial and national branches of the Canadian Cancer Society. A planned third floor was added in 1966. The building was "deconstructed" in 2009, with much of the building's material recycled including the greystone cladding for use with the E Wing that opened in 2013.
View of crowd attending opening ceremonies of the Saskatchewan Cancer and Medical Research Institute.
Bio/Historical Note: The Saskatchewan Cancer and Medical Research Institute was officially opened on 10 May 1958 by Premier T.C. Douglas. Clad in locally quarried greystone with limestone panels, it was the.last of the buildings that constituted the University’s Medical Complex’s initial phase. Designed by Izumi, Arnott and Sugiyama and completed at a cost of $783,000, the building’s purpose was to provide shared accommodation for both general medical research and cancer specific investigations. Funding came from the federal and provincial governments and the provincial and national branches of the Canadian Cancer Society. A planned third floor was added in 1966. The building was "deconstructed" in 2009, with much of the building's material recycled including the greystone cladding for use with the E Wing that opened in 2013.