Physics Building - Construction
- S-41
- Stuk
- 1966
Aerial view showing construction of the Physics addition, with a partial view of the Bowl and Administration Building.
4 results directly related Exclude narrower terms
Physics Building - Construction
Aerial view showing construction of the Physics addition, with a partial view of the Bowl and Administration Building.
Arts-Commerce-Law Complex Building - Construction
Elevated view of worksite with equipment, vehicles and men working on the sides of the building.
Bio/Historical Note: The Law and Commerce Buildings were designed and constructed as part of a single project between 1965 and 1967. The architect was John Holliday-Scott of the Saskatoon firm Holliday-Scott & Associates.
University Hospital - Construction
View of the start of construction of the University Hospital. Included are boulders and a storage shed. Thorvaldson Building in the background.
Bio/historical note: Designed by Webster and Gilbert, architects, and built between 1948 and 1955 by Smith Bros. and Wilson, contractors, at a cost of $7,000,000.00, the 6-storey, 7-wing University Hospital was officially opened by Bentley, T.J., Saskatchewan Minister of Health on May 1955.The name was officially changed to Royal University Hospital 23 May 1990.
Elevated shot looking south at the Observatory, Emmanuel and St. Chad as well as St. Thomas More. Man holding a movie camera at centre. Taken from roof of the Arts classroom wing.