Construction equipment√

Taxonomia

Código

Nota(s) de âmbito

Nota(s) da fonte

Mostrar nota(s)

Termos hierárquicos

Construction equipment√

Termos equivalentes

Construction equipment√

Termos associados

Construction equipment√

22 Archival description resultados para Construction equipment√

22 resultados diretamente relacionados Excluir termos específicos

Livestock Pavilion - Construction

Progress shot of construction of the Livestock Pavilion.

Bio/Historical Note: The Livestock Pavilion, one of the five original campus buildings, was designed by Brown and Vallance and constructed between 1910-1912. Built of red brick, slate and translucent glass panels (some of which could be opened for ventilation), it included a large show arena with seating. The Pavilion had a slaughter room and cold storage for the butchery courses. It was demolished in 1986.

Thorvaldson Building - Construction

View of construction work on Thorvaldson addition in the winter.

Bio/Historical Note: The Chemistry Building was enlarged with an addition and was renamed in honour of Dr. Thorbergur Thorvaldson, professor and dean of Chemistry from 1919-1959. The Thorvaldson Building opened on 6 June 1966. Architect John B. Parkin’s modern design continued with exterior stone cladding. The near windowless, stone three-storey addition provided classrooms, undergraduate and research laboratories, offices, a library and service facilities.

University Hospital - Cornerstone Laying Ceremony

Premier T.C. Douglas lays the cornerstone of University Hospital. Dignitaries join the Premier in attendance.

Bio/historical note: Designed by Webster and Gilbert, architects, and built between 1948 and 1955 by Smith Bros. and Wilson, contractors, at a cost of $7 million, the 6-storey, 7-wing University Hospital was officially opened by T.J. Bentley, Saskatchewan Minister of Health, in May 1955. The name was officially changed to Royal University Hospital on 23 May 1990.

University Hospital

View of the main entrance of University Hospital with crane and unidentified people standing in front.

Bio/historical note: Designed by Webster and Gilbert, architects, and built between 1948 and 1955 by Smith Bros. and Wilson, contractors, at a cost of $7,000,000.00, the 6-storey, 7-wing University Hospital was officially opened by Bentley, T.J., Saskatchewan Minister of Health, on May 1955. The name was officially changed to Royal University Hospital 23 May 1990.

University Hospital - Cornerstone Laying Ceremony

Premier T.C. Douglas stands on a platform with dignitaries at the cornerstone laying ceremony for University Hospital.

Bio/historical note: Designed by Webster and Gilbert, architects, and built between 1948-1955 by Smith Bros. and Wilson, contractors, at a cost of $7 million, the 6-storey, 7-wing University Hospital was officially opened by T.J. Bentley, Saskatchewan Minister of Health, in May 1955. The name was officially changed to Royal University Hospital on 23 May 1990.

University Hospital - Addition Construction

Construction of University Hospital addition.

Bio/historical note: Designed by Webster and Gilbert, architects, and built between 1948-1955 by Smith Bros. and Wilson, contractors, at a cost of $7 million, the 6-storey, 7-wing University Hospital was officially opened by T.J. Bentley, Saskatchewan Minister of Health, on May 1955. The name was officially changed to Royal University Hospital on 23 May 1990.

University Hospital - Construction

Looking northwest toward main entrance of new University Hospital.

Bio/historical note: Designed by Webster and Gilbert, architects, and built between 1948-1955 by Smith Bros. and Wilson, contractors, at a cost of $7 million, the 6-storey, 7-wing University Hospital was officially opened by T.J. Bentley, Saskatchewan Minister of Health, on May 1955. The name was officially changed to Royal University Hospital on 23 May 1990.

University Hospital - Wing Construction

View of a wing of University Hospital under construction. One worker on ground on front of scaffolding; one worker perched on scaffolding.

Bio/historical note: Designed by Webster and Gilbert, architects, and built between 1948-1955 by Smith Bros. and Wilson, contractors, at a cost of $7 million, the 6-storey, 7-wing University Hospital was officially opened by T.J. Bentley, Saskatchewan Minister of Health on May 1955. The name was officially changed to Royal University Hospital on 23 May 1990.

University Hospital - Wing Construction

View of a wing of University Hospital under construction. Crane at left.

Bio/historical note: Designed by Webster and Gilbert, architects, and built between 1948-1955 by Smith Bros. and Wilson, contractors, at a cost of $7 million, the 6-storey, 7-wing University Hospital was officially opened by T.J. Bentley, Saskatchewan Minister of Health on May 1955. The name was officially changed to Royal University Hospital on 23 May 1990.

Thorvaldson Building - Construction

Aerial view of foundations of Thorvaldson Addition being laid.

Bio/Historical Note: The Chemistry Building was enlarged with an addition and was renamed in honour of Dr. Thorbergur Thorvaldson, professor and dean of Chemistry from 1919-1959. The Thorvaldson Building opened on 6 June 1966. Architect John B. Parkin’s modern design continued with exterior stone cladding. The near windowless, stone three-storey addition provided classrooms, undergraduate and research laboratories, offices, a library and service facilities.

Septic Tank Construction

Crew of nine men and two horses pose for the camera. Part of South Saskatchewan riverbank has been excavated with wood framed structure under construction. CPR bridge in background. Stamped signature of A.R. Greig on back of photograph. "Septic tank on river bank" written on back.

Livestock Pavilion - Construction

Looking southeast at final stages of construction of the Livestock Pavilion; Main Barn construction visible at left.

Bio/Historical Note: The Livestock Pavilion, one of the five original campus buildings, was designed by Brown and Vallance and constructed between 1910-1912. Built of red brick, slate and translucent glass panels (some of which could be opened for ventilation), it included a large show arena with seating. The Pavilion had a slaughter room and cold storage for the butchery courses. It was demolished in 1986.

Resultados 1 a 15 de 22